JA Purity IV JA Purity IV
JA Purity IV JA Purity IV
  • About The Site
  • Blue Book
  • Public Velo Stuff
  1. You are here:  
  2. Home
  3. Velocette Documents
  4. KSS, KTS Manuals
  5. F236/4R Mk. II OHC Instruction Book 1950
  6. Lining Up the Flywheels

For lining up the Flywheels perfectly straightforward equipment is all that is required. The Flywheels should first be roughly lined up in the vice and then trued by placing the two Main-Bearings on their shafts, resting these on V blocks 5-in. from the shaft centres to the base and 2 3/8-in. apart, and then checking with a Dial-gauge on the Mainshafts. The Shafts are allowed a maximum out of truth figure of .001-in.

Previous article: Refitting the Crankpin Prev Next article: Refitting the Main Bearings Next
Open menu
  • Velocette Documents
    • GTP Manuals
      • F40/5R GTP Instruction Book 1951
    • KSS, KTS Manuals
      • F236/4R Mk. II OHC Instruction Book 1950
      • F42/3R OHC Models 1925-1931 Instruction Book
    • MAC Manuals
      • F469/4R MAC Service Guide 1965
      • F466/2R MAC Owner's Handbook 1955
      • F50/7R MAC Rigid Frame Service Manual 1955
      • F50/4R Supplement
    • MOV and MAC
      • F131-3R Instruction Book 1937
    • MSS Manuals
      • F477 Owners Handbook 1954
    • Venom, Viper, MSS
      • F485/1R Owner's Handbook 1956
      • F484/9R Service Guide 1967
      • F484/11R Service Guide 1971
    • Valiant Manuals
      • F62-1R Service Manual