A.

Page

Ammeter

79

B.

 

Big-end Bearing

43

Brakes.    Adjustment of

29

Brake (Rear).        Removal of

60

C.

 

Carburetter. Adjustment of

68

Carburetter. Working of

63

Chains.  Adjustment of

30

Charging System

73

Clutch Adjustment

51

Clutch.    Working of

49

Clutch (Diagram)

50

Clutch-Cable. Fitting new

53

Clutch. Dismantling and Re-assembling

53

Crankshaft Pinion. Re­moval of

41

Cut-out. Working of

78

Cylinder.    Removal of

39

Cylinder.    Inspection of

40

Cylinder Head. Removal of

32

Cylinder Head Joint

36

Compression Ratio (Alteration to)

46

D.

 

Dynamo

73

Dynamo Belt. Adjustment of

32

E.

 

Electrical System

73

Engine,    Dismantling and Re-assembling             

 39-49

Engine.   Decarbonising

32

F.

 

Flywheels.   Lining up

44

Flywheels.  Refitting to crankcase

44

Footstarter.         Dismantling and assembling          

58/59

Fork.   Adjustment of

23

Fork.     Dismantling

25

G.

 

Gearbox.    Dismantling

56

 

I.

Page

Ignition-Timing.    Checking and setting

38

 L.

 

Lighting System

73

Lubrication System. Engine

14

 M.

 

Magneto.    Removal of

41

Magneto, Dismantling, etc.

87

Mainbearings

41

O.

 

Oil Pump.      Removal of

41

Oil Pump (Illustration)

14

P.

 

Piston. Removing and Re‑fitting

 39-46

Piston Rings

40

S.

 

Shock Absorber (Engine Shaft).   Removal of

38

Sparking Plug

71

Suction Filter

16

Suction Filter (Illustration)

17

Steering Head. Dismantling and assembling

25

Switch, Lighting and Charg­ing

6

T.

 

Tappets.    Adjustment

29

Timing Gears. Removal of 

 41-47

Timing. Checking and set‑

ting of                                37-38

 

Tyre Pressure                         

31/32

 V.

 

Valves.    Removing and re‑fitting                          

34/35

Valve Timing. Checking and resetting

38

Valve Seats.     Recutting

40

Voltage Control Unit. Working of

79

 W.

 

Wheel (Rear). Removal of

60

Wheel (Front). Removal of

20